top of page

Custom Photo Editing for Engineering Projects

SCOPE OF THE WORK:

Enhanced aerial photography, increased exposure overall gradually from sky down, enhance sky / clouds.
Added color to dead grass and trees, brightened and
 clean up debris to highway and roads.
Opened up shadow details and use unsharp mask to enhance detail.
Increased resolution from 144 DPI to 200 DPI and sharpened details for best clarity / Visual / Output. 
Created sidewalk, made road look new with fresh asphalt millings.
Re-painted RPMs and road signs, per client specifications / instructions from PDFs.
Added 5’ Add 10’ shoulder, bus stop and cross walk signs, enhanced  colors, yellow road signs.

The engineering company proposes the following improvements
for the City of Miami intersection project:

 

- Apply a new layer of asphalt millings to enhance the intersection surface.

- Reconstruct and extend concrete sidewalks to ensure durability and safety.

- Repaint all RAPM (Residential Area Pedestrian Markings) and road signs for improved visibility.

- Upgrade electrical cabling to meet current standards and enhance reliability.

- Conduct thorough debris removal to maintain a clean and safe environment.

Project Scope:
 

- Construct a new bridge and canal to enhance traffic flow and drainage.

- Install rock features and apply new asphalt millings to refresh the roadway surface.

- Repaint all RAPMs (Residential Area Pedestrian Markings) and road signs for increased visibility.

- Relocate the light pole to the left side of the canal to optimize lighting and road safety.

Scope of Work:
 

- Apply new asphalt millings to refresh and improve the street surface.

- Rebuild and repaint all RAPMs (Residential Area Pedestrian Markings) and road signs to enhance visibility and safety.

- Install new pedestrian pathways to improve accessibility.

- Remove existing light poles and replace them with new, upgraded lighting fixtures to ensure adequate illumination.

Scope of Work:
 

- Apply new asphalt millings to improve the street surface.

- Reconstruct and repaint all RAPMs (Residential Area Pedestrian Markings) and road signs to enhance safety.

- Install pedestrian pathways / side walk to increase accessibility.

- Trim and clear overgrown trees to improve sightlines and safety.

- Install new light poles to provide adequate street lighting.

Key Largo, FL. Scope of Work:
 

- Apply new asphalt millings to resurface and enhance the street pavement.

- Reconstruct and repaint all RAPMs (Residential Area Pedestrian Markings) and road signs to improve safety and visibility.

- Establish new grass areas where needed to enhance landscaping and overall site aesthetics.

Project Scope: Street Rehabilitation and Streetscape Improvement:
 

- Widen the roadway to enhance traffic flow and safety.

- Apply a new layer of asphalt millings to the street surface to restore durability and improve overall pavement quality.

- Establish or extend grassed areas at incoming cross streets to enhance curb appeal and promote greenery.

- Remove accumulated debris throughout the project area to maintain cleanliness and ensure proper drainage.

- Trim, manage and open previously shaded or dark areas from trees, increasing natural light and improving visibility.

Scope of Work:
 

- Apply new asphalt millings to improve the street surface.

- Reconstruct and repaint all RAPMs (Residential Area Pedestrian Markings) and road signs to enhance safety.

- Install pedestrian pathways / side walk to increase accessibility.

- Trim and clear overgrown trees to improve sightlines and safety.

- Install new light poles to provide adequate street lighting.

Scope of Work: Street Surface Improvement and Pedestrian Safety Enhancement.

 

- Apply a new layer of asphalt millings to improve the quality and durability of the street surface.

- Reconstruct and repaint all Residential Area Pedestrian Markings (RAPMs) and road signs to enhance visibility. 

- Install new pedestrian pathways and sidewalks to increase accessibility and promote walkability.

- Trim and clear overgrown grass and vegetation to improve sightlines and enhance safety for both pedestrians.

- Open up and illuminate dark areas beneath the bridge, as well as remove debris.

Jairo Addison can realistically visualize how the images will look before the work even begins.
We don't believe in limitations or roadblocks. Our philosophy is that with the right skills, tools, and vision, we can accomplish anything.

© 2025 Jairo Addison, reserves the right to pursue unauthorized users of any images used in this website. 

All other Trademarks are property of their respective owners.

  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
  • YouTube
  • TikTok
bottom of page